Home
Home Cases Domestic cases Integrated smart energy
Integrated smart energy
Integrated smart energy

Inner Mongolia Yidong Shagedu Industrial Park PV-Storage-Charging Project

Release time:2026-10-29


Project Name: Inner Mongolia Yidong Shagedu Industrial Park PV-Storage-Charging Project


Project Location: Jungar Banner, Ordos City, Inner Mongolia Autonomous Region


Project Introduction:


To address the pain points of "high energy consumption and high costs" in industrial park transportation, this project leverages regional resources to build a green power transportation system featuring "distributed + ground-mounted PV + PV-storage-charging synergy." Distributed PV is deployed on 555 mu of idle land and 1.11 million m² of rooftops within the park, complemented by a ground-mounted power station built on 5,000 mu of land 26 km away (with an initial 20 MW PV investment). The green electricity is transmitted to the park via the Three Gorges transmission line. A 5 MWh energy storage system is configured in parallel to ensure stable power supply. The project deploys 500 electric trucks equipped with 466 kWh batteries, supported by 68 dual-gun 720 kW charging piles for ultra-fast charging that matches the high-frequency transportation needs of the trucks. This achieves the replacement of traditional energy with green electricity, supporting 500 trucks in completing 2 trips per day with a daily energy replenishment demand of 300,000 kWh.