
Project Name: Xinzhou Lijiaping Freight Consolidation Station PV-Storage-Charging Integrated Project
Project Location: Xinzhou City, Shaanxi Province
Project Introduction:
The project plans to utilize the coal shed rooftops and idle land within the Lijiaping station of Shanxi Cihang Energy Co., Ltd. to construct a 12 MWp PV power station, 30 sets of 480 kW fast chargers, 5 sets of 1,440 kW megawatt-level liquid-cooled ultra-fast chargers, and an estimated 10 MWh lithium iron phosphate (LFP) chemical energy storage system. The total construction period is 12 months, planned in two phases. Phase I has a 6-month construction period, tentatively scheduled from January 2026 to June 2026, including a 6 MWp PV station, 10 sets of 480 kW fast chargers, 1 set of 1,440 kW megawatt-level liquid-cooled ultra-fast charger, and the corresponding LFP energy storage system. Phase II has a 6-month construction period, tentatively scheduled from July 2026 to December 2026 (specific implementation timing to be determined based on Phase I construction and operation), including a 6 MWp PV station, 20 sets of 480 kW fast chargers, 4 sets of 1,440 kW megawatt-level liquid-cooled ultra-fast chargers, and the corresponding LFP energy storage system.